No | Nama Peserta | K | B | A | T | P | PT | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. TUNJUNG JAYA - 93.591.220.4-528.000 | Rp. 464.071.460,58 |
Rp. 464.071.460,58 |
||||||||
2 | C.V.SOSRO KARYA - 02.082.579.0.528.000 | Rp. 487.950.907,66 |
Rp. 487.950.907,66 |
||||||||
3 | CV.Sri Kedaton - 71.904.864.7-528.000 | Rp. 502.375.809,70 |
Rp. 502.375.809,70 |
||||||||
4 | CV UNGGUL SEJATI - 01.811.539.4-528.000 | Rp. 474.411.735,40 |
Rp. 474.411.735,40 |
Pakta keselamatan Konstruksi tidak untuk pelaksanaan pekerjaan Peningkatan Jalan Paulan (Bekas TPS), Tidak mengupload uraian E. Pemantauan dan Evaluasi dan Tabel Jadwal Inspeksi dan Audit | |||||||
5 | CV. SETIA BUDI - 02.304.792.1-528.000 | Rp. 484.114.149,13 |
Rp. 484.114.149,13 |
Tidak melampirkan bukti kepemilikan peralatan dari pemberi sewa peralatan: Concrete Mixing Plant, Truck Mixer, Concrete Vibrator | |||||||
6 | CV. NUSA INDAH - 01.752.168.3-528.000 | |
|
||||||||
7 | CV. DARMO PUTRO - 31.816.487.8-528.000 | |
|
||||||||
8 | CV. INDRA WIJAYA - 01.582.822.1-528.000 | |
|
||||||||
9 | CV. JK MULYA - 82.396.136.2-528.000 | |
|
||||||||
10 | CV.CENTRAL KARYA - 90.542.624.3-528.000 | |
|
||||||||
11 | CV.SIGRA TEKNIK - 90.554.418.5-528.000 | |
|
||||||||
12 | CV.WAHYU ADI - 01.915.302.2-528.000 | |
|
||||||||
13 | LEGRA SEJAHTERA. CV - 21.009.378.7-528.000 | |
|
||||||||
14 | KARTIKA - 02.513.868.6-532.000 | |
|
||||||||
15 | CV. DUTA KARYA - 02.283.041.8-515.000 | |
|
||||||||
16 | CV. RAJIN SEMBADA - 94.371.619.1-528.000 | |
|
||||||||
17 | CV. SIDO MUNCUL - 02.766.800.3-528.000 | |
|
||||||||
18 | CV. MANUNGGALING QOLBU - 80.257.135.6-528.000 | |
|
||||||||
19 | CV. MULTIKARYA MANDIRI - 21.002.512.8-528.000 | |
|
||||||||
20 | CV. KENAR KONSTRUKSINDO - 83.939.798.1-528.000 | |
|
||||||||
21 | CV CATUR MANUNGGAL - 90.650.046.7-528.000 | |
|
||||||||
22 | CV. KARYA PUTRA MULIYA - 02.304.714.5-528.000 | |
|
||||||||
23 | CV. BONAFIDE ABADI - 21.005.848.3-528.000 | |
|
||||||||
24 | CV. SAKA TUNGGAL - 21.051.426.1-528.000 | |
|
||||||||
25 | cv. Naafi Alam Sentosa - 31.674.038.0-532.000 | |
|
||||||||
26 | CV. REJEKINING ABADI - 02.399.629.1-528.000 | |
|
||||||||
27 | cv.Berkah karya mandiri - 72.115.716.2-528.000 | |
|
||||||||
28 | PT HEFA SARANA KONTRAKTOR - 31.693.742.4-528.000 | |
|
||||||||
29 | CV. SATRIA UTAMA - 02.304.969.5-528.000 | |
|
||||||||
30 | CV. ARGO SIMPING - 01.107.214.7-522.000 | |
|
||||||||
31 | CV. MANUNGGAL JAYA ABADI - 31.280.242.4-542.000 | |
|
||||||||
32 | CV ADHI LAKSANA INDONESIA - 02.782.763.3-532.000 | |
|
||||||||
33 | CV. DUTA KENCANA JAYA - 01.444.608.2-528.000 | |
|
||||||||
34 | CV Rizky Paramesty - 85.606.302.9-532.000 | |
|
||||||||
35 | CV.WAHYU KARUNIA ABADI - 21.058.127.8-526.000 | |
|
||||||||
36 | CV. FIRJATULLAH - 02.766.841.7-528.000 | |
|
||||||||
37 | CV. REVINA DEWI PERKASA - 83.938.917.8-646.000 | |
|
||||||||
38 | CV. SURYA GRAHA UTAMA - 02.766.709.6-528.000 | |
|
||||||||
39 | CV. DODO PROPERTY - 75.502.662.7-309.000 | |
|
||||||||
40 | CV. JACK KINDO - 75.089.248.1-528.000 | |
|
||||||||
41 | cv.putra manunggal - 74.440.620.8-528.000 | |
|
||||||||
42 | CV KARANGJATI - 01.207.712.9-528.000 | |
|
||||||||
43 | CV. ANUGERAH SURYA LINTANG - 85.780.641.8-543.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak